Your browser doesn't support javascript. This means that the content or functionality of our website will be limited or unavailable. If you need more information about Vinnova, please contact us.

Numerical Simulation for Optimisation of Rock Drilling and Loading for Mining

Reference number
Coordinator Luleå tekniska universitet - Avdelningen för Material- och solidmekanik
Funding from Vinnova SEK 499 000
Project duration April 2021 - September 2021
Status Completed
Venture The strategic innovation programme for Swedish mining and metal producing industry - SIP Swedish Mining Innovation
Call Tackling sustainability, environmental and climate challenges in the mining and metals industry

Important results from the project

The objective of the pre-study was to develop and evaluate physically realistic numerical models for rock drilling and loading of rock material. The models developed within the project has shown good potential for simulation of drilling and loading where rate of penetration and wear has been predicted. Field measurements of wear and bucket filling has been used for preliminary validation of the model for loading, with adequate agreement. Due to difficulties to perform on site field measurements of drilling no validation of the drilling model has been conducted within the project.

Expected long term effects

Within the pre-study, rock material has been characterized experimentally at lab-scale at LTU. The characterization has been conducted at high strain-rates and attempts has been made to characterize at high confining pressures. A numerical model of rock has been further developed and evaluated. The model has been calibrated against experiments and has been used for drilling simulations where transport of rock cuttings has been included. A model for loading and wear has been further developed and evaluated. The model has been used for loading of rock for different bucket geometries.

Approach and implementation

The project was conducted as a collaboration between div. for Solid Mechanics at LTU and Boliden Minerals AB. LTU has been responsible for experimental characterization and model development and Boliden for model development and data gathering in Aitik. In the project proposal field measurements of drilling parameters were planned. These could not be conducted within the project, partly due to difficulties in visiting Aitik during the Covid-19 pandemic. These field measurements will be performed in a planned full-scale innovation project where Boliden is a project partner.

External links

The project description has been provided by the project members themselves and the text has not been looked at by our editors.

Last updated 10 November 2021

Reference number 2020-04492