Digital Infrastructure for the Automated and Connected Transport System, Pilot Study
Reference number | |
Coordinator | AstaZero AB |
Funding from Vinnova | SEK 400 000 |
Project duration | December 2023 - April 2024 |
Status | Completed |
Important results from the project
The project´s aim and objective is to supplement the proposal for a feasibility study with the working name Digital Infrastruktur for the Automated and Uppkopplade Transportsystemet. We consider that the goal has been met since we´ve produced a proposal that responds to previous criticisms.
Expected long term effects
The proposal that has been produced will hopefully lead to an approved project that will be implemented June 2024-June 2025, which in turn will lead to further implementation projects where the national digital infrastructure described in proposal is rolled out on Swedish roads.
Approach and implementation
To achieve the stated objectives, the following methods have been applied: - Workshops/writing sessions - Literature studies - Meetings with stakeholders