Arena project PTC June 2015 Sanco

Reference number
Coordinator Swerea IVF AB - Avdelningen för Tillverkning
Funding from Vinnova SEK 100 000
Project duration June 2015 - March 2016
Status Completed

Purpose and goal

The goal of the project was to identify how Sanco AB needs to change their operation in order to meet the requirements of AS9100. Sanco has received a good idea of what is required by the company to achieve the requirements of AS9100 and thereby, in the field of quality, be qualified as a subcontractor to companies in the aerospace industry.

Results and expected effects

The GAP analysis together with the proposed measures have been compiled in a report. The results of the survey will strengthen the opportunities for Sanco to live up to the requirements of AS9100. It is a basic requirement in order to become a supplier to the aerospace industry of components made mainly with advanced machining.

Approach and implementation

The work was carried out through a visit to Sanco (2015-07-01) by Carolina Pettersson and Mats Werke from Swerea IVF, followed by teleconferences and email communication between Sanco and Swerea IVF. On these occasions AS9100C was examined in detail and the gap between the company operation and the requirements of AS9100 was noted. Only the points that differ between AS9100 and ISO 9001: 2008 were reviewed.

The project description has been provided by the project members themselves and the text has not been looked at by our editors.