Semi-automated Dismantling System for Battery Metal Recovery and Recycling

Reference number
Coordinator Northvolt Revolt AB
Funding from Vinnova SEK 4 991 130
Project duration March 2022 - May 2024
Status Completed
Venture The strategic innovation programme for Swedish mining and metal producing industry - SIP Swedish Mining Innovation
Call Resource Efficiency and Sustainable Production in the mining and metal-producing industry

Important results from the project

The initiative culminated in the creation of an automated disassembly pilot system for EV lithium-ion battery packs, enhancing the efficiency of mechanical recycling. This robotic pilot system is capable of performing different critical disassembly operations of battery components, facilitating the recovery of valuable metals and ensuring sustainable raw material utilization and ensuring a safe and ergonomic EV battery pack Disassembly.

Expected long term effects

The main project results and outcomes are: (A,B) Detailed and validated mechanical study of the disassembly process, (C) Installed and commissioned robotic EOA tools (TRL 7), (D) deployed vision system (TRL 7), and (E) Pilot scale robotic fully functioning system integrating all project parts in robotics, tooling, vision systems, and digital solutions (TRL 7). Additionally, the project has impacted significantly in the technological readiness of robot dismantling, opening new R&D perspectives both for recycling and flexible robotics.

Approach and implementation

Approaching the project challenge with well-defined work packages and responsibilities respectively linked into the final target helped creating a cross functional team. Each project party contributed mostly within its specific designated area but also collaborated in the shared integration areas, sharing knowledge and acquiring new expertise across organizations. Moreover, weekly meetings were established and consistently attended by most team members. Such consistent communication significantly contributed to building strong team dynamics and collaboration.

The project description has been provided by the project members themselves and the text has not been looked at by our editors.

Last updated 8 November 2024

Reference number 2021-04720