Additive manufacturing of ballistic protection
Reference number | |
Coordinator | VBN Components AB |
Funding from Vinnova | SEK 1 090 000 |
Project duration | November 2024 - July 2025 |
Status | Ongoing |
Venture | Civil-military synergies |
Call | Acceleration of Civil-Military Innovations 2024 |
Important results from the project
Expected long term effects
Approach and implementation
Technical development of module design, joining and material took place in parallel with training in defense industry. The approach worked well, but the collaboration with the defense industry and authorities took longer than expected. The expectation of getting a clear picture of requirements and needs analysis was not met, which made the development of the product more difficult. The project was given a more civilian focus focused on the concept, to later be measured against military needs.