Your browser doesn't support javascript. This means that the content or functionality of our website will be limited or unavailable. If you need more information about Vinnova, please contact us.

TRUCKFOLD: Tool-free and resource-efficient manufacturing of components for electric warehouse trucks

Reference number
Coordinator STILFOLD AB
Funding from Vinnova SEK 671 000
Project duration October 2026 - September 2027
Status Ongoing
Venture FFI ASP - Accelerated Startup Partnership: increased innovation collaboration between startups and need owner
Call FFI ASP - Accelerated Startup Partnership: increased innovation collaboration between startups and need owner - autumn 2026

Purpose and goal

The aim is to industrialize STILFOLD´s software-defined curved folding for industrial production at Toyota Material Handling in Mjölby. Flat sheet metal is folded into finished components without press tools – faster, lighter and cheaper. Objective: The SPE battery cover is taken through design, prototype and pilot series of 50–100 units; SPE side protection and VCE battery cover to validated design. The project raises TRL 6→8 and BRL 6→7 and lays the foundation for series production.

Expected effects and result

The project provides a validated, tool-free manufacturing method for sheet metal parts in Mjölby: the battery cover in a pilot series of 50–100 units and validated designs for side protection and battery cover. Effects for TMH: no investments in press tools, shorter lead time from design to production, lower weight and material consumption. För STILFOLD: first reference in high volume, TRL 8 and BRL 7. The results open up for series production and use on components in more vehicle platforms.

Planned approach and implementation

The project runs from Oct 2026 to Sep 2027 in four work packages. AP1: project management, business model and calculation. AP2: design, simulation and verification of the three components against TMH´s eligibility requirements. AP3: prototypes and pilot series of 50–100 battery hoods in the STILWORKS cell, tested in Mjölby. AP4: validation, industrialization plan and decision basis for series. Varje AP concludes with a milestone TMH contributes with eligibility requirements, testing and review.

The project description has been provided by the project members themselves and the text has not been looked at by our editors.

Last updated 14 October 2026

Reference number 2026-03181