Your browser doesn't support javascript. This means that the content or functionality of our website will be limited or unavailable. If you need more information about Vinnova, please contact us.

TEXAS: Transatlantic EXchange for Automated vehicle Safety testing Stage 2

Reference number
Coordinator AstaZero AB
Funding from Vinnova SEK 1 000 000
Project duration June 2026 - June 2027
Status Ongoing
Venture Advanced digitalization - Industrial needs-driven innovation
Call US collaborations in AI, digital infrastructure and cybersecurity Stage 2

Purpose and goal

TEXAS Stage 2 examines to what extent external sensors in intersection infrastructure (cameras and edge perception) can control the actors in a controlled ADAS/AD test the way GNSS RTK does today. One NCAP-relevant dangerous scenario is captured at an instrumented intersection in Austin with simultaneous RTK ground truth and reproduced twice at AstaZero´s proving ground: once driven by RTK, once by perception data. The goal is a measured quantification of the gap and a reusable methodology.

Expected effects and result

The project delivers two quantitative measurements: perception accuracy against RTK at the source, and the divergence between the RTK-driven and perception-driven replay at the proving ground. The result is a gap analysis methodology describing the accuracy, update rate and latency required for infrastructure data to drive controlled tests. Effects: lower validation cost for OEMs, safer protection of vulnerable road users, and input to standardisation (Euro NCAP, ETSI CPM, SAE SDSM).

Planned approach and implementation

Twelve months in four work packages. WP1: selection of a Euro NCAP scenario (e.g. CPLA/CPNA) and capture protocol. WP2: coordinated capture at UT Austin´s intersection with Intel edge perception, Trihydro´s SDX broadcasting SAE J2735, and RTK-instrumented actors, all time-synchronised. WP3: perception-aware ATOS adapter and two replay runs at AstaZero. WP4: methodology, demonstration day with the U.S. partners, and a joint technical report. AstaZero coordinates; the working group meets bi-weekly

The project description has been provided by the project members themselves and the text has not been looked at by our editors.

Last updated 24 August 2026

Reference number 2026-01559