| Reference number |
2026-01537 |
| Coordinator |
RISE Research Institutes of Sweden AB - RISE
|
| Funding from Vinnova |
SEK 2 098 962 |
| Project duration |
June 2026 - June 2029
|
| Status |
Ongoing |
Purpose and goal
The project will establish a new experimental capability at the national metrology institute (NMI) in ion trapping and atomic control, including expertise in radiofrequency trap design and laser–atom interaction. The overall goal is to establish the experimanental foundations required for future optical frequency standards in Sweden based on a trapped single-ion systems.
Expected effects and result
The project will establish an ion-trapping platform for strontium ions, a central building block for an optical atomic clock in Sweden. This capability will prepare our NMI towards the upcoming re-definition of the SI second. Beyond metrology, ion traps are a key technology with applications in quantum sensing and quantum computing. The project therefore strengthens both the national metrology infrastructure and long-term competence in quantum technologies in Sweden.
Planned approach and implementation
The work focuses on the development of an ion trapping platform for strontium ions, structured into four work packages (WPs) described below.
-Design and implementation of an ion trap system for stable confinement of single Sr+ ions.
-Design and implementation of the laser systems required for photoionization and Doppler cooling.
-Implementation of fluorescence-based ion detection and monitoring of trapped-ion operation.
-Validation of system performance and dissemination of results.
The project description has been provided by the project members themselves and the text has not been looked at by our editors.