Important results from the project

The project assesed the technical, economic, environmental, & structural feasibility of combining solar energy with conductive charging rails for heavy EV.The findings indicate potential for local renewable electricity generation along roads and highlight the need for battery storage and grid support. Pavement loading tests identified the transition between asphalt and charging rails as a critical area for fatigue cracking. The results provide a basis for improved design and further development.

Expected long term effects

In the long term, the project could support the sustainable electrification of heavy transport by combining renewable electricity generation with in-motion charging. The findings can inform future decisions on charging infrastructure location and design, as well as the sizing of solar PV systems, battery storage, and grid connections. Knowledge of pavement durability may contribute to longer service life and reduced maintenance. The concept could also be used for ports, airports, & bus stations.

Approach and implementation

The project combined solar resource and energy cost assessments with structural loading tests on pavements fitted with conductive charging rails. Solar energy was assessed at four Swedish and two US locations, focusing on electricity generation, storage, and economics. Heavy Vehicle Simulator (HVS) tests examined pavement stresses and strains near the charging rails. This approach addressed both energy supply and road durability. The project schedule was followed.

External links

The project description has been provided by the project members themselves and the text has not been looked at by our editors.

Last updated 3 November 2026

Reference number 2025-04005