Your browser doesn't support javascript. This means that the content or functionality of our website will be limited or unavailable. If you need more information about Vinnova, please contact us.

Simulation of Cuttings Generation and Flushing for Optimized Rock Drilling

Reference number
Coordinator Luleå tekniska universitet - Luleå tekniska universitet Inst f teknikvetenskap & matematik
Funding from Vinnova SEK 6 000 000
Project duration November 2025 - November 2029
Status Ongoing
Venture Impact Innovation Metals & Minerals - Program-specific efforts Vinnova
Call Impact Innovation: Research and development projects within Techological Action Areas in the Swedish Metals and Minerals program

Purpose and goal

The project aims to develop and validate digital models describing the generation and transport of drill cuttings in rock drilling. Its goal is to enable more efficient and sustainable drilling by optimizing drill bit design, flushing strategies, and operating parameters for both top-hammer and water-powered down-the-hole drilling.

Expected effects and result

The project will deliver a validated open-source simulation tool for improved drilling performance. The results are expected to reduce energy and water consumption, extend tool lifetime, and minimize downtime, strengthening the competitiveness and sustainability of the Swedish mining industry.

Planned approach and implementation

The project is led by Luleå University of Technology in collaboration with Epiroc Drilling Tools and LKAB Wassara. It combines laboratory and field tests with numerical simulations coupling rock fragmentation and flushing flows, validated against real drilling data.

The project description has been provided by the project members themselves and the text has not been looked at by our editors.

Last updated 11 November 2025

Reference number 2025-03115