Your browser doesn't support javascript. This means that the content or functionality of our website will be limited or unavailable. If you need more information about Vinnova, please contact us.

Resource optimisation in the automotive sector: Designing circular production systems for arctic Terrain vehicles

Reference number
Coordinator RISE Research Institutes of Sweden AB
Funding from Vinnova SEK 4 816 000
Project duration July 2023 - July 2025
Status Completed
Venture Innovations for sustainable mobility
Call Innovations for sustainable mobility - For a climate-neutral future - spring 2023

Important results from the project

The project demonstrated how simulation shows growth, lifespan and seasonality affect circular upscaling and the transition time from linear to circular vehicle fleet. Environmental and economic impacts of a circular system with distributed micro-production have been assessed through an LCA study and profitability calculation. In addition, the project has analyzed the eligibility requirements of the circular economy (CE) for a growing company can organize themselves to deliver long-term value.

Expected long term effects

System Dynamics has proven effective in visualizing production and business models. The project has increased understanding of circular systems, where product architecture is the key to reuse. Case studies show the potential of microproduction. LCA and calculations provide insights to reduce environmental impact and risks. And the need for IT-support for CE has been identified. The results encourage new partnerships and collaborations in production and customer partnerships

Approach and implementation

The project aims to address four overarching areas: 1) technology, products and processes; 2) business models and investments; 3) policy and regulation; and 4) behavior, culture and values. By creating a common platform for knowledge exchange for different stakeholders, the project will enable a co-creation process to solve complex challenges. Based on this, the project was organized into five different work packages where the content and deliverables from them were specified.

External links

The project description has been provided by the project members themselves and the text has not been looked at by our editors.

Last updated 14 November 2025

Reference number 2023-01274