Opportunities and Challenges with mass management systems (MUMS): Circularity vs inspections
| Reference number | |
| Coordinator | Ecoloop AB |
| Funding from Vinnova | SEK 1 518 000 |
| Project duration | April 2024 - April 2026 |
| Status | Completed |
| Venture | The strategic innovation program InfraSweden |
| Call | SIP InfraSweden: Increased circularity for the transport infrastructure |
Important results from the project
Yes, the project´s objective was largely met. The project contributed to increased knowledge about circular mass management at a system level and to the development of practical support in the form of guidance and checklists. An in-depth study of the social aspects has been carried out, which has also led to new project applications together with municipalities.
Expected long term effects
In the longer term, the project is expected to contribute to more feasible and accepted circular mass management. The results can lead to earlier and more systematic integration of circular solutions in planning and decision-making processes, reduced goal conflicts and more effective collaboration between municipalities and other actors. The project also forms a basis for further application, scaling up and method development.
Approach and implementation
The project was implemented through a combination of needs analysis, case studies, dialogue and shared learning between municipalities, authorities, researchers and private actors. The work included workshops, exchange of experiences and analysis of practical examples of mass logistics areas. The results were compiled in the form of a guide and checklist as well as a film as support for planning, dialogue and implementation of circular mass management.