Your browser doesn't support javascript. This means that the content or functionality of our website will be limited or unavailable. If you need more information about Vinnova, please contact us.

Health, Safety, and Quality in a Digital Plattform for Manufacturing Staff

Reference number
Coordinator Kungliga Tekniska Högskolan - Kungliga Tekniska Högskolan Skolan f kemi bioteknologi & hälsa
Funding from Vinnova SEK 4 514 999
Project duration June 2022 - November 2025
Status Completed
Venture The strategic innovation programme for Production2030
Call Sustainable Work in the Manufacturing Industry

Important results from the project

The project has in several respects gone beyond the original goals and delivered more knowledge and results, but in some respects the original goals have been redefined towards the needs highlighted by industry partners. The system has been developed to become more flexible and now includes different risk assessment models (for biomechanical load) based on the needs of each company. The project has also built up unique knowledge in the network between industry partners, researchers and RISE.

Expected long term effects

The project results are expected to contribute to increased use of measurement methods with smart work wear in risk assessment. This means better reliability of risk assessments, lower costs and increased credibility compared to observation methods. Production engineers are expected to be able to become more active in designing good working environments with these tools. Risk assessments will be carried out with more relevant and more reliable method choices.

Approach and implementation

A system of smart work wear for strain ergonomic risk assessment (it measures work postures and movements, has analysis modules and provides suggestions for measures) has been developed and tested through collaboration between Volvo Cars, Astra Zeneca, SKF, Volvo CE, RISE and KTH, UU and KI. Between the tests at the companies, the system has been discussed in physical meetings, as well as in web meetings every other week. The system has been iteratively improved based on the companies´ views.

External links

The project description has been provided by the project members themselves and the text has not been looked at by our editors.

Last updated 12 December 2025

Reference number 2022-01287