FUSION: Flexible Utilization of Seamless Integrated Smart Infrastructure For Optimized ENergy in Buildings
| Reference number | |
| Coordinator | Kungliga Tekniska Högskolan - Kungliga Tekniska Högskolan Skolan f arkitektur & samhällsbyggn |
| Funding from Vinnova | SEK 288 950 |
| Project duration | June 2025 - February 2026 |
| Status | Completed |
| Venture | Global cooperation 2025 |
| Call | Planning grant for international proposal 2025 |
Important results from the project
The planning project is structured as an intensive 10-month process with resource allocations from Kungliga Tekniska Högskolan and MG Sustainable Engineering AB. It focuses on developing a strong project concept, building a qualified international consortium, and preparing a competitive proposal for the Horizon Europe call. Activities include concept development, partner mobilization, pre-feasibility studies, and full proposal drafting.
Expected long term effects
Strengthen cooperation between international partners for future joint EU projects. Through the expanded network and the collected experiences, the opportunities to apply for and implement new projects increase. This will lead to increased innovation capacity, technological development and more efficient solutions in sustainable energy. In the long term, the project will contribute to a stronger position in the market, increased competitiveness and increased cooperation within the EU.
Approach and implementation
The project was implemented according to plan. The partners carried out all activities include concept development, partner mobilization, pre-feasibility studies, and full proposal drafting. The work in the planning project was structured into three work packages, covering coordination, project structuring, and proposal writing and submission, ensuring alignment with criteria on excellence, impact, and implementation sections.