Your browser doesn't support javascript. This means that the content or functionality of our website will be limited or unavailable. If you need more information about Vinnova, please contact us.

Eira - FROST - Field Resilient Off-road UGV Systems Trial in Winter Climate

Reference number
Coordinator Eira Systems AB
Funding from Vinnova SEK 500 000
Project duration June 2026 - March 2027
Status Ongoing
Venture Civil-military synergies
Call Support to small and medium-sized enterprises for testing and evaluating technology solutions that contribute to defense innovation

Purpose and goal

Eira Frost will test and validate Eira Systems’ electric off-road UGV in Nordic winter conditions together with Millog in Finland. The goal is to verify mobility, energy performance and operational usability for logistics, support and evacuation in snow, mud, cold weather and soft terrain. The project builds on own technology where traction control, mobility and terrain understanding are connected to Eira’s software stack for autonomy and robust operation.

Expected effects and result

The project is expected to deliver verified test results from Millog’s winter environment for Eira’s platform, including wheel, halftrack and fulltrack configurations. The results will support further product development, military use cases and future cooperation with defence and resilience actors.

Planned approach and implementation

The project will be carried out through field tests in Finland using Millog’s test environment and operational experience. Eira will prepare the vehicles, sensors, energy systems and mobility configurations. Tests will cover mobility, ground pressure, battery performance, autonomy and operational use.

The project description has been provided by the project members themselves and the text has not been looked at by our editors.

Last updated 12 July 2026

Reference number 2026-01615