Your browser doesn't support javascript. This means that the content or functionality of our website will be limited or unavailable. If you need more information about Vinnova, please contact us.

Development for Produktionslyftet100

Reference number
Coordinator RISE Research Institutes of Sweden AB
Funding from Vinnova SEK 6 500 000
Project duration September 2023 - March 2026
Status Completed

Important results from the project

The project largely delivered on the objectives set at the outset. The coaching methodology was strengthened, and approaches for encouraging companies to apply to Produktionslyftet’s programmes were further developed. The organisational structure was also reinforced. In addition, the project helped strengthen external credibility and secure long-term industrial co-funding, while also fostering stronger collaboration with related initiatives and generating new contacts and research findings.

Expected long term effects

In the longer term, the project is expected to strengthen Produktionslyftet’s ability to reach a greater number of manufacturing SMEs with quality-assured development support. This may lead to enhanced capacity within industry for continuous improvement, renewal and transformation, as well as stronger links between coaching and training, improved national and regional collaboration, and greater long-term stability through increased legitimacy and industrial co-funding.

Approach and implementation

The project was carried out through three work packages: methodology development; structure and communication to reach companies; and strengthening of the organisation and quality assurance. The work was closely integrated with day-to-day operations and developed progressively. The timetable was adjusted in part to reflect companies’ availability and differing regional conditions, but collaboration functioned well overall and the project was completed with good results.

External links

The project description has been provided by the project members themselves and the text has not been looked at by our editors.

Last updated 1 June 2026

Reference number 2023-03366