Bi-wave monitoring
| Reference number | |
| Coordinator | Swerea KIMAB AB |
| Funding from Vinnova | SEK 750 000 |
| Project duration | November 2011 - March 2012 |
| Status | Completed |
| Venture | Challenge-Driven Innovation – Stage 1 initiation |
| Call | Challenge-driven innovation - Stage 1 Initiation 2011 |
Important results from the project
The project will evaluate the opportunity with bi-wave ultrasonic to measure the stress in a material without knowing the specific material, material history or the geometry of the test piece. This will give an increased use of the materials capacity and a better process monitoring, which will reduce the use of both material and economical resources.